Software CAD is very popular in designing the 2D drawings  作

Software CAD is very popular in designing the 2D drawings 作

Introduction:
The aim of the assignment is to apply software CAD to design an open metal mine. Before do the assignment, the mine planning engineer is required to prepare, part of a conceptual feasibility study you are involved in, a plan of the final pit excavation for the copper/gold ore body as defined and showing the surface area disturbed, area allocated for waste dump and the profiles of the final pit outlines for proposed open pit mining of the nominated ore bodies which is regular grade throughout.
Background:
Software CAD is very popular in designing the 2D drawings  
Software CAD is very popular in designing the 2D drawings, such as mechanical drawing, open mine pit drawing, building drawing and so on. If it is necessary, CAD can be used in the designing of 3D drawings. The following figure is an example that CAD is used in the design of an open metal mine.

           Figure 1 the application of CAD in the design of open metal mine
Overview:
The paper is mainly for the research of open metal mine. As to the traditional research method, it is very difficult to demonstrate the idea of the designer intuitionally. But with the help of software CAD, we can demonstrate our design very intuitionally. Although we can use CAD, the calculation is also the most import item, you should first have a feasibility program base on the precise calculation. The calculations include building site, the volume of the mine, the width of the haul road and so on.
In order to complete the assignment, the main contents of the paper is as following:
1. Confirm the design parameter, have a full comprehensive of the requirement.
2.  Have a rough estimate of the volume of waste -including swell- to be stored and the waste dump layout should cater for this volume and tonnage of ores (different colors represent different ore types)
3.  Do the calculation for the related parameter before design the drawings.
4.  After complete all the calculation and confirm all the parameters, do the drawing.
With the above research method, the workers who execute the building can complete the mine establishment very easily, because if the any confusion happened, the building parameter can refer to the design drawings.
Design parameters:
Software CAD is very popular in designing the 2D drawings  作業代寫
  The following parameter is the input data, the design should be according to the parameters
a)      Working face batter angle: 65?
      Effective final pit wall batter: 50 including haul road
b)  Bench height: 15m
c)  Haul road width: 20m
?  d)  Haul road direction: Clockwise
?  e)  Minimum turning cycle radius: 25m
??f)  Haul road gradient: 8%
??g)  You must determine the final berm width
??h)  The top of the final open pit should be no less than 100m from any buildings.
??i)  Maximum waste dump height 100m, rehabilitation slope angle 18? and final swell   25%.
??j)  Toe of the dump must be at least 100m back from top of final pit and from the processing plant.
??k) The length of haul road from the top of the open pit to the plant and the waste dump should be minimize.
Base on the above data, the parameter that need to calculation is as following:
a)      Number of Benches
Depth of pit = 165 m, bench height = 15 m
Number of benches = Pit depth / bench height = 165/15 = 11
b)      Bench face with
Width of pit wall = Wall height / tan50 =165 /tan50 =138.45 m
Slope face width = Bench height / tan65 = 15/tan65 = 6.995 m
c)      Singular bench width
Total bench width = Total wall width – Haul Road Width ×2 – Total slope face width = 138.45m – ( 20m × 2 ) – ( 11 × 6.995 ) = 21.505 m
There are only 8 benches on the wall, since 2 the benches are eliminated by the haul road, and the final bench is located on the surface.
Bench width = Total bench width / number of benches = 21.505 m / 11 = 1.955m
The table of the calculation for the volume of pit is shown as the following table
Parameter Value Remark
Depth of pit 165 m  
Bench height 15 m  
Number of benches 11  
Haul Road Width 20 m  
Working face batter angle 65○  
Minimum turning cycle radius 20 m  
Haul road gradient 8%  
Width of pit wall 138.45 m  
Slope face width 6.995 m  
Total bench width 21.505 m  
Bench width 1.955m  
Volume of the pit 9344293m3  
 
 
Site plan and layout
Software CAD is very popular in designing the 2D drawings  作業代寫
The footprint of the processing plant is 100 m by 50 m, the location of the processing plant is in the north of the pit. The distance between the top of the pit and the center of the processing plant is 200 m
The footprint of mine office is 100 m by 50 m, the location of the office is in the south of the pit. The distance between the top of the pit and the center of office is 100 m.
The footprint of the mine workshop is 50 m by 20 m, the location of the office is in the west of pit. The distance between the top of the pit and the center of the workshop is 250 m.
The table of the calculation for the volume of pit is shown as the following table
 

下一篇:沒有了

聯系阿德萊德作業代寫

QQ: 273427
QQ: 273427

阿德萊德作業代寫咨詢

/Adelaide__homework代寫時間
全天接單不間斷

價格性感 質量豐滿
Copyright ? 2002-2012 悉尼論文代寫,墨爾本論文代寫,悉尼作業代寫.墨爾本作業代寫.

在線客服

售前咨詢
售后咨詢
微信號
Essay_Cheery
微信
ESSAYCASE |essay代写|assignment代写|paper代写,全球在线写作中心 EasyDue™-北美地区论文作业ESSAY代写服务机构,作业代写-覆盖100+全学科 EssayBerry:美国论文ESSAY代写服务,代写essay,统计代写,代写文章 EssayWill-论文代写网|经济代写,数学,CS代写,Assignment代写 Essaymint:专注软文代写和代写作业等服务|作业代写-100%原创高分 Essay代写,论文代写,Report代写,网课代修-浩天教育 Essay代写-Assignment「免费修改」Paper代写,-51Due留学教育 Essay代写-各学科论文代写|留学作业网课代修代做|优质的代写文章的网站 Essay代写|Assignment代写|提供留学生Essay代写服务-留学写作网 ITCS代写 | math代写,统计代写,金融代写,economic,accounting代写等